You have
Ordinary site power
You need
Hummingbird® or BoostchargerThe battery fills slowly from the site power. The machine gets fast charging during the break.
Project managers, site managers and plant managers
We bring the power and connect in a day. Excavators and trucks charge on the construction site, in the tunnel and on the mountain.

Site power gives 63 amps. The excavator wants 300 kW. We deliver chargers, battery and control that close the gap, and that move with the project.
The power that is there decides what you need. Find your situation.

You have
You need
Hummingbird® or BoostchargerThe battery fills slowly from the site power. The machine gets fast charging during the break.

You have
You need
BoostPointA fast charger without a battery. Moved by forklift or crane to where the machines are.

You have
You need
BoostStackA power grid of your own on site. Solar, a generator and site power charge the battery.

From our monitoring. Map: © OpenStreetMap contributors.
In 2019 we delivered batteries for the first electric excavators. The construction site did not have enough power to charge them. So we built the first mobile fast charger. It came in 2021.
We invented the technology, and Aneo took it out to the contractors. That is how more than a hundred units came into operation. We keep an eye on every one of them from the office, and go out when something needs fixing.
If there is no grid at all, we set up a small power grid of your own on site. The battery is at the core. Everything else connects around it.
Solar, site power and a generator charge the battery. You decide the order, for example solar first and the generator last. Energy management follows it every second, and turns chargers and production up and down so nothing clashes.
If the grid comes later, we connect it. The system switches by itself between running on its own and running on the grid.

We deliver, connect and keep an eye on the whole project.
What you need, when you need it, and what the grid can give. We fetch the meter data.
We compare the quotes and write the funding application with you. About funding.
Our own technicians commission the site and show you how to use it.
Regular service on the chargers and the battery, so the site lasts.
Need more power in the middle of the project? We connect more. The equipment is yours, and it moves with you to the next job. How we keep an eye on it.
Tell us where the site is, which machines need to charge and when you start. Then we come back with a proposal and a date.