About us

Power where it’s needed, when it’s needed.

We are a team of happy problem-solvers in Rælingen. Since 2016 we have provided power where the grid falls short: on construction sites, at depots and at power plants.

Two of the founders sit on the trailer of a mobile charger

What sets us apart is what happens afterwards.

Anyone can buy the equipment. A site that has to run every day for many years needs people who know it. That is why we keep an eye on everything we deliver.

Technicians certified on Sungrow products. Parts in our own stock. Certified Miljøfyrtårn (Eco-Lighthouse).

100+

sites in operation around Norway. No. 1 on Deloitte Technology Fast 50 Norway in 2024.

Every step started with a customer who lacked power.

Five people by an early battery container marked Battery Super Charger

2016

It started with battery packs.

We built battery packs for ships, and then for the first electric excavators, together with Pon Power. The excavators went electric. Then we saw the next problem.

An electric Volvo excavator in the snow by two Nordic Booster charging containers

2019

The machine was electric. The construction site had no power.

We built Boostcharger, a fast charger with a battery. Later came Hummingbird®, which is towed right up to the machine. It showed that zero-emission construction sites were possible. Today our movable batteries create their own power grid where there is no grid.

Two people look into an open reBooster battery made from used truck batteries

2024

The trucks were electric. The grid was full.

A depot in Oslo needed more fast chargers, but the grid could not give more. Together with Scania we built reBooster from used truck batteries. The battery takes the peak, and the chargers get full power. If a pack fails, we replace it. See how the depot does it.

Batteries and chargers stand ready in a large industrial hall

Today

The grid needs balance. Power plants need room.

With our co-owner Akershus Energi we built a pilot plant at Helsfyr. Its energy management became Norway’s first approved FCR-N controller on a Norwegian battery. Now we control many batteries from the office as one power plant, also for Karmsundgruppen. And at Furuseth we won the tender for Norway’s first large solar and battery hybrid. About power plants.

The people you meet.

Most of us have built the sites with our own hands.

A technician works inside a battery, against the light

The service team

Repairs battery packs right down to cell level. Comes out with parts from our own stock.

A hand draws on an electrical diagram

The project managers

Handle drawings, applications and the construction site, until the site is up and running.

How we work.

You are there at the start. We do the rest.

Already have a battery or chargers? They can often connect to the same energy management.

  1. Three people from Nordic Booster look at a phone together at a trade fair

    Step 1

    We listen and measure

    Half an hour on the phone or at your site. Then we fetch the meter data and find your peak. You get a one-page power analysis, free of charge.

  2. An open battery with its cabinet doors up, being checked outside our hall

    Step 2

    We apply and build

    We deal with the grid company, and with Statnett, the Norwegian grid operator, if the battery is going into reserve markets. Everything is built and tested in our hall before it ships.

  3. A technician in a hi-vis jacket watches chargers and batteries being loaded onto a truck

    Step 3

    We deliver and commission

    Our own technicians commission the site and show you how to use it.

  4. A technician presses the screen on a battery

    Step 4

    We keep an eye on it

    We see alarms, temperature and battery health, and fix most things before you notice. You can log in and see the same as we do.

Batteries and chargers stand ready in the yard outside our hall

Come and see the hall.

A battery is easier to understand once you have stood next to one. We are twenty minutes from Oslo, close to Lillestrøm.

Nordic Booster AS, Slynga 6, 2005 Rælingen, Norway